2017/10/03 Surveying project

Location: Sarvajanik College of Engineering & Technology, Surat. 

Time: 8:30 AM to 1:30 PM

We had to perform two practicals based on our syllabus on that day. The whole class gathered at the Surveying lab at 8:30 am onwards . We were divided into two batches. The first practical was Gale’s Traverse & the second practical was Plotting the Curves.

Gale’s Traverse Table:

In this practical, we plotted the main stations and the building stations on the field. We performed many activities like chaining, offsetting, measuring the distances and measuring the angles between main stations. After that the calculation was done and the sheets were drawn. 

Calculation of travers
Sheet of traverse

Offsetting from long chord:-

We already complete all the calculation of this curve means length of tangent,angle and offsets length.After it we directly plot the curve by measuring angle with the use of theodolite and horizontal distance with the use of tape.This curve was plot by batch-A

Curve was ploted by Batch-A on field

Full Batch photo